Preliminary engineering design and PPL utility interconnect applications were provided for two (2) 5.7MW solar turbines at 12470V repowering of the industrial manufacturing site. Two (2) additional heat recovery steam generators were installed to produce steam from the turbines’ heat and send the steam to existing boilers at the facility. We also completed the interconnection application and relaying approval.
12MW Landfill Gas Cogeneration Project

Leola, PA
Combined Heat and Power