132MW Natural Gas Generation Project

132MW Natural Gas Generation Project
Hunlock Township, Luzerne County, PA
Medium Voltage Substations and Relaying

We were contracted to perform engineering, testing, and commissioning of a power station’s outdoor 66kV switchyard. There were two (2) separate scopes to this work. The first part consisted of the addition of a new switchyard for the combustion turbine generator repowering of the plant. The second part consisted of modifications to the existing switchyard to support the reuse of the existing plant steam turbine and plant equipment.

The project consisted of a 90MW natural gas plant utilizing two (2) step-up transformers and two (2) turbines that fed into a new 66kV substation. A third 30MW turbine powered by the steam heat recovery fed into the existing 66kV west bus. The existing switchyard substation consisted of 60MVA transformers, fiber optic communication with UGI electric utility, telephone line procurement, and coordination. PJM RTU design, assembly, and programming for Internet-based RTU using the ARCOM director was utilized for this project.

<< Return to Medium Voltage Substations and Relaying

300 Brookside Avenue, Building 14
Ambler, PA 19002
Phone: 215-884-5970
Fax: 215-884-5973
info@kupperengineering.com

 

  • Home
  • About Us
  • Services
  • Support
  • Projects
  • News
  • Careers
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Copyright © 2022 · Genesis Framework · WordPress · Log in