Kupper Engineering

Evolved Engineering

  • Home
  • About Us
    • Leadership
    • Affiliations
  • Services
    • Renewable Energy
    • MEP/FP Design
    • Systems Integration
    • Utility Communications
    • Procurement/EPC
    • Protective Relays & Studies
  • Support
  • Projects
  • News
  • Contact Us
  • Careers

Dairy Digester RNG Facility

Landfill Gas, Biogas, and Renewable Natural Gas (RNG)

Jerome, ID

We provided electrical and controls system engineering design services for the installation of a 1400 SCFM digester gas to a renewable natural gas (RNG) facility.  This included engineering design services for development of electrical single line diagrams with major electrical loads and equipment, specification of major electrical equipment, design of electrical equipment layout with PDC, conduit and cable schedules and plans, along with generating estimates for electrical equipment and electrical construction. Control system design work included the creation of specifications for controls equipment, development of a network communication diagram, control conduit and cable schedules and plans, point to point connection details, and reconciliation of P&ID and control drawings.  (Project pending completion)

<< Return to Landfill Gas, Biogas, and Renewable Natural Gas (RNG)

300 Brookside Avenue, Building 14
Ambler, PA 19002
Phone: 215-884-5970
Fax: 215-884-5973
info@kupperengineering.com

 

  • Home
  • About Us
  • Services
  • Support
  • Projects
  • News
  • Careers
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Copyright © 2022 · Genesis Framework · WordPress · Log in