We provided system integrations services for the H2S control system at a county landfill in Boise, ID to remove H2S from the landfill gas stream. Our services included electrical engineering design services, and coordination and design of communications connections for SCADA system integration. Our team provided all hardware and programming in the PLC panel to operate environmental control devices, such as methane sensor inputs, exhaust fan controls, gas analyzer and related equipment shunt trip controls, and updated sequence of operations. Reducing the H2S helps decrease odors and allows more landfill gas to be drawn for the generation of renewable electricity.
H2S Scrubber Control System for a Landfill Facility

Boise, ID
Control Panel Design and Build