Kupper Engineering

Evolved Engineering

  • Home
  • About Us
    • Leadership
    • Affiliations
  • Services
    • Renewable Energy
    • MEP/FP Design
    • Systems Integration
    • Utility Communications
    • Procurement/EPC
    • Protective Relays & Studies
  • Support
  • Projects
  • News
  • Contact Us
  • Careers

High BTU Plant Conversion from LFG to RNG

Landfill Gas, Biogas, and Renewable Natural Gas (RNG)

Kupper Engineering, Inc. (KEI) provided electrical engineering design services for a new high BTU plant to convert landfill gas to renewable natural gas.  KEI drafted single line diagrams for all systems, including medium voltage (15kV service, 5kV motors).  Our team also provided a major electrical equipment layout plan, and electrical design, which included miscellaneous power to skids, devices, and building, wire and conduit run list, panel schedules, communications conduits, lightning protection, and a short circuit study to determine minimum AIC ratings for electrical components.  KEI determined the interconnection voltage and handled utility interconnection coordination with the local utility.

<< Return to Landfill Gas, Biogas, and Renewable Natural Gas (RNG)

300 Brookside Avenue, Building 14
Ambler, PA 19002
Phone: 215-884-5970
Fax: 215-884-5973
info@kupperengineering.com

 

  • Home
  • About Us
  • Services
  • Support
  • Projects
  • News
  • Careers
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Copyright © 2022 · Genesis Framework · WordPress · Log in