Category: Commercial Buildings

Swarthmore College’s Michael Mullan Tennis Center

Kupper Engineering provided mechanical, electrical, and plumbing engineering services for Swarthmore College’s Michael Mullan Tennis Center on the college’s campus in Swarthmore, PA.  Our team performed HVAC load calculations for the new golf room, fitness area, and physical therapy area within the Center, and designed a new variable refrigerant flow heating and cooling system with …

Swarthmore College’s Michael Mullan Tennis Center Read More »

Pharmaceutical Company Fit Out

Our team provided engineering design services for a pharmaceutical company’s 105,000 square foot space in Exton, Pa.  This included utility coordination, circuiting and panel schedule details, lighting control systems for all receptacles and interior lighting fixtures, and emergency and egress lighting design. We also provided the fire alarm system design, and coordinated electrical requirements for …

Pharmaceutical Company Fit Out Read More »

Pharmaceutical Company Headquarters Fit Out

We provided MEP design services and construction administration services for the top floor of this 20,000 square foot 4-story building.  This included schematic design, design development, and construction documentation and permit drawings. Photo Credit: © Jeffrey Totaro, 2018.

Corporate Headquarters Fit Out

We provided MEP/FP design and construction administration services for a business analytics and solutions company’s 75,000 square foot corporate headquarters in Atlanta, Ga., and their 85,000 square foot office in Blue Bell, Pa. Our team also provided generator commissioning services at the Blue Bell location.  

Software Services Company Fit Out

We performed MEP design and construction documentation services for this tenant fit out project for a software company’s new headquarters (approx. 30,000 square feet).  The space included two floors with an interior open staircase and open ceiling concept, and featured unique design elements, including a full game room with a pool table and shuffleboard, hammock …

Software Services Company Fit Out Read More »

Healthcare Brokerage Firm (2 Buildings)

For Building I (120,000 square feet), we performed the MEP construction documentation for multiple tenant improvement projects for this existing building. This project involved the following: New lighting layout and modification of HVAC, electrical distribution, lighting controls, and fire protection.  It also included documentation for all back boxes of tele/data outlet locations and fire alarm …

Healthcare Brokerage Firm (2 Buildings) Read More »

LinkedIn
Facebook